Bingham Township
Bob and Sandra Sinnaeve (Trunorth Landscaping) Excavation for installing landscape project. Phase one hardscapes/ pavers, Phase two plantings at 5958 S. Lake Leelanau Drive ($140).
Elizabeth Garner (TruNorth Landscaping) Extending existing drainage pipes to mitigate the erosion on hillside, installation of dry river bed in shaded yellow area-no planting or mulching phase 1 at 6175 S. Westwood Parkway ($140),
Centerville Township
Darryl Herman (Pine Grove Homes/Matt Black) Put 1 new house on crawl space, new well and hook up to sanitary sewer all soils will be seeded and mulched when complete at 4805 S. Green Street ($140).
Cleveland Township
Brenda Salisbury and Brad Jackson (Leelanau Construction LLC) Silt Fence as needed at 4571 S. Wheeler Road ($140).
Allen and Renee Gradowski (Hebblewhite Builders Inc.) Remove existing asphalt parking area/driveway and construct garage/pole barn construction at 3761 S. Bay Bluffs Drive ($140).
Empire Township
Steve and Jill Kirscherner (TruNorth Landscaping) Landscape project with Lighting, irrigation system and hardscapes at 8853 S. Dunns Farm Road ($140).
Glen Arbor Township
Leelanau Conservancy (AJ’s Excavating) Earthwork grading for new aggregate trail and pavilion used area erection of pavilion and footings at 6096 S. Wheeler Road ($140).
Kasson Township
Sarah and Josh Miller (North Coast Construction) Excavation for a new build with a basement, new drive at 8185 S. Maple City Road ($140).
Leelanau Township
Marcia Boynton (Jerry Spears) Improve sump and ground water drainage to village drain by means of sock pipe and solid pipe in trench with fabric and drain stone at 115 E 4th Street ($140).
Leland Township
Matthew Galla (Self) Removing small trees and flatten area for concrete slab at 1862 N Lake Leelanau ($140).